One Saddle Arm
The BNT Family series of nonmetallic cable supports are the latest entry into the cable support product lines manufactured by Underground Devices. The BNT is a truly versatile cable support system - the arms can be installed either in nonmetallic stanchions or certain styles of metallic stanchions. Arm installation is safe and simple - the arms are secured in place with nonmetallic pins, allowing for installation and removal of the arms without disturbing any cable. The BNT Series Cable Supports are non-conductive and will never rust or corrode. Grounding and insulators are no longer necessary. The BNT Cable Support Arms have loading capacities that are comparable to similar steel cable racks.
- Can be Used with Nonmetallic or Steel Stanchions
- Normally only two bolts required to secure Stanchion to wall
- Easy to install arms. Single cross pin per arm
- Nonmetallic.Will not Rust or Corrode
- No Grounding or Bonding
- Molded from UL Listed Glass Reinforced Polymer
- Insulators are not required
- Excellent Dielectric Properties.
You Might Also Like
![]()
Configurator
-
Stanchion
-
BNT-S952A - Accommodates up to 5 arms
-
BNT-S942A - Accommodates up to 4 arms
-
BNT-S932A - Accommodates up to 3 arms
-
BNT-S922A - Accommodates up to 2 arms
-
BNT-S912A - Accommodates 1 arm
-
-
Arm01
-
BNT-A1 - 1 Saddle Arm - 5.042" Long
-
BNT-A2 - 2 Saddle Arm - 10.041" Long
-
BNT-A3 - 3 Saddle Arm - 15.039" Long
-
BNT-A4 - 4 Saddle Arm - 20.021" Long
-
BNT-F6 - Flat Arm - 6" Long
-
BNT-F11 - Flat Arm - 11" Long
-
BNT-F16 - Flat Arm - 16" Long
-
BNT-F21 - Flat Arm - 21" Long
-
BNT-F26 - Flat Arm - 26" Long
-
-
Arm02
-
BNT-A1 - 1 Saddle Arm - 5.042" Long
-
BNT-A2 - 2 Saddle Arm - 10.041" Long
-
BNT-A3 - 3 Saddle Arm - 15.039" Long
-
BNT-A4 - 4 Saddle Arm - 20.021" Long
-
BNT-F6 - Flat Arm - 6" Long
-
BNT-F11 - Flat Arm - 11" Long
-
BNT-F16 - Flat Arm - 16" Long
-
BNT-F21 - Flat Arm - 21" Long
-
BNT-F26 - Flat Arm - 26" Long
-
-
Arm03
-
BNT-A1 - 1 Saddle Arm - 5.042" Long
-
BNT-A2 - 2 Saddle Arm - 10.041" Long
-
BNT-A3 - 3 Saddle Arm - 15.039" Long
-
BNT-A4 - 4 Saddle Arm - 20.021" Long
-
BNT-F6 - Flat Arm - 6" Long
-
BNT-F11 - Flat Arm - 11" Long
-
BNT-F16 - Flat Arm - 16" Long
-
BNT-F21 - Flat Arm - 21" Long
-
BNT-F26 - Flat Arm - 26" Long
-
-
Arm04
-
BNT-A1 - 1 Saddle Arm - 5.042" Long
-
BNT-A2 - 2 Saddle Arm - 10.041" Long
-
BNT-A3 - 3 Saddle Arm - 15.039" Long
-
BNT-A4 - 4 Saddle Arm - 20.021" Long
-
BNT-F6 - Flat Arm - 6" Long
-
BNT-F11 - Flat Arm - 11" Long
-
BNT-F16 - Flat Arm - 16" Long
-
BNT-F21 - Flat Arm - 21" Long
-
BNT-F26 - Flat Arm - 26" Long
-
-
Arm05
-
BNT-A1 - 1 Saddle Arm - 5.042" Long
-
BNT-A2 - 2 Saddle Arm - 10.041" Long
-
BNT-A3 - 3 Saddle Arm - 15.039" Long
-
BNT-A4 - 4 Saddle Arm - 20.021" Long
-
BNT-F6 - Flat Arm - 6" Long
-
BNT-F11 - Flat Arm - 11" Long
-
BNT-F16 - Flat Arm - 16" Long
-
BNT-F21 - Flat Arm - 21" Long
-
BNT-F26 - Flat Arm - 26" Long
-
Let's discuss your needs.
The team at Underground Devices is here to help.
Please feel free to contact us with any questions or requests that you may have. We look forward to hearing form you.
Woodbridge Energy Project, New Jersey
The Woodbridge Energy Project was a created to help supply energy to the NY/NY metro area to meet the growing demand for power while also increasing the reliability of the local electrical grid. Underground Devices provided custom designed and manufactured bore spacers to support the conduits in the horizontal directional drilled (HDD) casings. These HDD installations crossed underneath two environmentally sensitive wetland areas. Each HDD was approximately 2,000 linear feet.
O’Hare Modernization Program, Chicago, IL
The O’Hare Modernization Program was a broad effort to reconfigure the old airfield into a new more efficient runway, taxiway, terminal, and roadway system, reducing delays and increasing capacity to meet future aviation needs. In this photo, Underground Devices, Inc., Wunpeece Spacers were used to install a large duct bank of 5” power conduits adjacent to a new runway.
UPS Hub 2000 Project, Louisville, KY
The UPS Hub 2000 project was a $1.1 billion project that doubled the size of UPS’s package sorting operation at its hub in Louisville, KY. The project contains a large utility corridor in which Underground Devices Multi-Mount Cable Support Arms were utilized to support the vast network of power cables installed to support this major upgrade. The photo featured for this project is a recent photo, showing what the installation looks like 20 years after installation.