The Woodbridge Energy Project was a created to help supply energy to the NY/NY metro area to meet the growing demand for power while also increasing the reliability of the local electrical grid. Underground Devices provided custom designed and manufactured bore spacers to support the conduits in the horizontal directional drilled (HDD) casings. These HDD installations crossed underneath two environmentally sensitive wetland areas. Each HDD was approximately 2,000 linear feet.

08.26.2021

